Shell MB Lab – Houston, TX

About the Project

Butler-Cohen was engaged by CH2MHill to renovate a laboratory building at Shell’s Technology Center. The scope of work included renovation of existing labs, new restrooms, administrative areas and break areas. All work was completed while the facility was in use. The duration of the project was seven months. The work took place in a high security, high risk area with limited laydown and storage areas.

  • Completed: 2015
  • Square feet: 2,303